Home / Sample

Fictional sample liquidity review

Fictional sample. The firm, its projects, clients and every figure are invented to show the format of a $950 liquidity review. It uses the same fictional firm as the sample 13-week forecast, so the two documents tie together.

Liquidity review - fictional sample

Northfield Design Group (fictional)

Fictional 60-person architecture firm
Review date: November 2026 (fictional)
Opening cash: $820,000
Receipts that could arrive sooner (estimated)$463k
Of which high confidence$340k
Timing-only payment move$90k
Margin at risk, not cash$55k

Ranked actions: where project cash is stuck (fictional)

#FindingBalanceActionCash timing (estimate)ConfidenceOwner
1Riverside milestone awaiting client sign-off$192,000Get sign-off on the construction documents deliverable and invoice the same dayWeek 6 instead of week 9HighPrincipal in charge
2Unbilled work on completed phases, over 30 days$148,000Invoice approved phases on Harbor Library ($66,000), Elm Street Clinic ($52,000) and Pinecrest Offices ($30,000) this weekWeeks 3-6 on 30-day termsHighProject managers, controller
3Receivables over 60 days$85,000Owner-to-owner calls with Lakeside Partners ($55,000) and Avery Schools ($30,000); agree dates in writingWeeks 2-8MediumManaging partner
4Retainage held on a completed public project$38,000Assemble the closeout documents the client requires before releaseWeeks 8-12LowController
Receipts identified$463,000Each balance counted once. Not new profit: receipts moved earlier or made more certain.

Check: $192,000 + $148,000 + $85,000 + $38,000 = $463,000 of receipts. High confidence covers actions 1 and 2: $192,000 + $148,000 = $340,000.

Separate from the receipts above

Vendor payment timing, $90,000. Northfield pays two large vendors well inside their 45-day terms. Paying them on full terms moves $90,000 from weeks 6-7 to week 10. It is timing only and reverses in week 10, so it is shown on its own line and never added to the receipts total.

Margin drift on Lakeside, $55,000. The fixed-fee Lakeside project has used 82 percent of its fee with about 60 percent of the work done. On the current staffing plan the job finishes about $55,000 over budget. That is margin, not cash this quarter: the actions are a change order for the added scope the client requested in October, and a revised staffing plan for the remaining phases.

How this connects to the 13-week forecast

The fictional 13-week forecast carries only the two moves with firm timing: the Riverside sign-off ($192,000, week 6 instead of week 9) and the vendor timing ($90,000 across weeks 6-7, reversing in week 10). Together they lift the week 7 low point from $470,000 to $752,000. Actions 2 to 4 stay out of that after-case until their dates are confirmed, so the forecast doesn't count cash that isn't certain yet.

What a real review includes

The same table built from your exports, a short written summary of the causes, the data behind each balance, and a walkthrough. Balances come from your WIP schedule, receivables aging and billing records; timing and confidence are estimates agreed with you, not guarantees.

Fictional sample. Every figure is illustrative.Mesfonic is not a CPA firm.

Want this for your company?

Reporting and forecasting built on your real project and cash numbers.

hello@mesfonic.com