Home / Toolkit

Credit line sizing calculator

How much committed credit your forecast actually needs: the line size that keeps cash at or above your floor even at the 13-week low point. Runs in your browser; nothing is stored or sent.

Your numbers
From your 13-week forecast, before any line draws. May be negative.
The balance below which payroll and critical payments feel unsafe
Exclude amounts already drawn or unavailable under the borrowing base. Use projected cash before any new draws.

Results update as you type.

Your resultEstimate
Draw needed to meet the floor-
Extra availability needed-
Cash at low point after drawing only what is needed-

Enter your numbers to see the result.

How this tool works

The model is one subtraction, stated plainly so its limits are visible. The draw needed to meet the floor equals the cash floor minus the lowest projected cash balance: if the forecast bottoms at -$180,000 and the floor is $150,000, the line must supply $330,000 at that point. Extra availability needed is that draw minus the undrawn credit you will have available at the low point. Cash at the low point after drawing only what is needed lands exactly on the floor, by construction.

Three assumptions do the heavy lifting, and each deserves a challenge. First, the line is fully available at the low point - no borrowing base shortfall, no covenant block, no lender discretion. If your facility is borrowing-base driven, run the borrowing base calculator as well; the smaller of the two availabilities is the real one. Second, the forecast low point is right; a forecast that is optimistic by $100,000 undersizes the line by $100,000, which is why the milestone slip stress test belongs next to this calculation. Third, the floor itself is a judgment - our guide to minimum cash balance covers how to set it from payroll and payment cycles rather than from habit.

Worked example

Example with the default numbers: the 13-week forecast bottoms at -$180,000, the floor to maintain is $150,000, and the firm expects $200,000 of undrawn committed credit to be available at the low point. The draw needed is $330k ($150,000 - (-$180,000)). Extra availability needed is $130k ($330,000 - $200,000 available). Drawing $330,000 at the low point leaves cash at $150k - exactly the floor. The lesson hides in the middle figure: the firm has $200,000 available and a forecast that needs $330,000, so it is $130,000 short at exactly the week it can least afford a negotiation. Sizing the line from the low point, in a calm week, is the whole exercise. These are example numbers, not your firm.

Common questions

Where does the low point come from?

From a 13-week cash flow forecast: the lowest weekly ending cash balance over the next 13 weeks, before any draws on the line. If you do not have one, the free 13-week cash flow calculator in this toolkit produces a first version from weekly collections and payments.

Should the line be bigger than the calculated need?

The calculation covers the forecast low point only. Shocks the forecast does not include - a slipped milestone, a lost client, a tax surprise - argue for headroom above it. How much is a judgment about forecast reliability; firms with volatile collections usually carry more.

Does a bigger line cost money if it is not drawn?

Typically there are commitment or unused-line fees and arrangement costs, and a larger line can come with tighter reporting or covenants. The comparison is against the cost of running out of cash at the low point, which is usually worse - but the line should be sized, not maximized.

What if my line is borrowing-base limited?

Then the committed amount is a ceiling, not a promise: availability is the lesser of the cap and the borrowing base, minus borrowings. Size the line with this calculator, then check availability with the borrowing base calculator, especially if receivables include retainage.

Keep reading

General information, not advice for your specific situation. Part of project-based FP&A: the discipline of running cash, margin and liquidity project by project.

Want a low point you can defend to a lender?

Line sizing is only credible if the forecast underneath it is. A 13-week cash flow forecast builds the weekly low point from your actual receivables, payables and project timing - a forecast management can review and share with its lender. $2,900 fixed fee.