Fixed fee vs time and materials calculator

The same project priced both ways: revenue, cost and margin at the estimated hours and again if the hours overrun, and who absorbs the overrun under each model. Runs in your browser; nothing is stored or sent.

Your numbers
Loaded cost per hour worked

Results update as you type.

Fixed fee vs time and materialsEstimate
T&M margin with overrun-
Fixed-fee margin with overrun-
Cost of the overrun hours-
Fixed-fee margin % with overrun-

Enter your numbers to see the result.

How it works

Under time and materials, revenue is hours times the bill rate and cost is hours times the cost rate, so both rise together when hours overrun and the margin percent holds. Under a fixed fee, revenue is the fee whatever the hours, so every overrun hour adds cost and takes it straight out of margin. The firm absorbs the overrun under a fixed fee; the client absorbs it under time and materials.

Worked example with the default numbers: 200 estimated hours at a $90 cost rate and a $150 bill rate. At the estimate, time and materials earns $30,000 against $18,000 of cost, a $12,000 margin at 40.0%. A 25% overrun takes the work to 250 hours: time and materials earns $37,500 against $22,500, a $15,000 margin still at 40.0%. The $32,000 fixed fee earns $14,000 of margin at the estimate (43.8%), but the same overrun leaves $9,500 (29.7%), because the firm absorbs the $4,500 cost of the extra 50 hours. These are example numbers, not your rates.

Pricing a whole project?

The free project pricing calculator template for Excel costs each role and expense by month, prices to your target margin and shows the deal's peak cash need. No email or sign-up.

Want pricing risk priced before you sign?

A liquidity review tests your current project mix for overrun exposure, unbilled work and slow collections, and ranks the fixes by cash impact. $950 fixed fee, delivered in about a week.