Enter your numbers to see the result.
Pricing a whole project?
The free project pricing calculator template for Excel costs each role and expense by month, prices to your target margin and shows the deal's peak cash need. No email or sign-up.
Worked example
Example with the default numbers: an 8-month project costing $60,000 a month, billed at cost plus 25%, a 45-day payment lag (2 months once rounded up) and a 10% deposit. Monthly billing is $75,000 and the contract is worth $600k. The $60k deposit in month 1 covers that month's cost exactly, then cumulative cash falls to -$60k in month 2 before receipts start landing in month 3. The peak cash need is $60k in month 2. Cumulative cash returns to zero in month 6, the payback month, and ends at +$120k - the $600k contract minus $480,000 of costs. These are example numbers, not your project.
Common questions
Why does a profitable project need cash at all?
Because costs are paid monthly while receipts arrive later. The gap between paying for work and being paid for it has to be funded by someone, and by default that someone is you.
How does the deposit change the curve?
A deposit received in month 1 offsets the earliest costs, which are the ones no receipt has reached yet. It is credited against the final invoice, then earlier invoices if needed, so it does not change total profit - it changes timing, which is the whole problem. No invoice produces negative receipts.
Why is the payment lag rounded up to whole months?
Receipts land on specific days, but a monthly model has to place each receipt in one month. Rounding a 45-day lag up to 2 months is the cautious reading: it assumes the receipt misses the earlier month end.
What lowers the peak cash need?
A bigger deposit, faster payment terms, billing more often than monthly, or costs that start lighter and ramp up. Each lever moves the deepest point of the curve, which is the number your cash balance or credit line has to cover.
Keep reading
Want every project's curve in one forecast?
One project's curve is a warning; all of them together are your cash forecast. A 13-week cash flow forecast lays every project's timing over payroll and payables week by week. $2,900 fixed fee.
Mesfonic is not a CPA firm. It does not provide audit, review, attest, tax, legal or investment services, and nothing on this site is professional advice for your specific situation.
Forecasts and analyses are estimates based on the information you provide. Actual results will differ.