Resource utilization tracker template

Billable utilization and rate efficiency for project teams of up to 50, by person, department and project. Set a target for each role and see who is below it - and whether the hours are earning the planned fees - before the month is out.

Download the template

Excel workbook · No macros · Fictional example · No email or sign-up

The Utilization Tracker tab, showing each person's role, department, project, available and billable hours, and utilization against target (fictional data).
Fictional example data. Replace it with your own.

61.3% utilization, and why the blended number is lower

The fictional team of six logs 588 billable hours out of 960 available, so utilization is 61.3%. Bill rates come in slightly under target (96.5% rate efficiency), which takes blended efficiency down to 59.1%: busy is not the same as earning the planned fees.

Fictional example: utilization and rate efficiency by person
PersonRoleUtilizationUtilization targetRate efficiencyBlended efficiency
Resource 01Senior consultant80.0%75%93.8%75.0%
Resource 02Consultant70.0%75%91.7%64.2%
Resource 03Analyst60.0%70%88.9%53.3%
Resource 04Project manager45.0%60%104.0%46.8%
Resource 05Consultant87.5%80%95.8%83.9%
Resource 06Principal25.0%30%111.1%27.8%

The blended efficiency target is each role's utilization target at full bill rate. Three people (in bold) are more than 5 points below it and are highlighted: the analyst (53% blended against a 70% target), the project manager (47% against 60%), and one consultant (64% against 75%: 70% utilization at 92% rate efficiency). The principal is 2 points under, inside the alert gap.

All figures are fictional.

What's inside, tab by tab

Every workbook opens on a Start here tab with the steps and a model check that says OK when everything ties out. Formula cells are protected against accidental edits; there's no password, so you can unprotect a sheet to adapt it.

What's in the workbook, tab by tab
TabWhat you enterWhat it works out
ListsDepartments, roles with a target utilization each, projects or service lines, the alert gap, period datesNothing - it feeds the drop-downs and targets
Utilization TrackerPer person: role, department, main project, available, billable and non-billable hours, actual and target bill rate, optional target override, next period's available and booked hoursUtilization vs target, rate efficiency, blended efficiency, billable value, next period's utilization and unbooked hours, department and project roll-ups, charts, the model check

How to use it

Blue cells are inputs. Everything else calculates.

  1. Set up your lists

    Enter departments, roles with a target utilization for each, and your projects or service lines.

  2. Add your team

    Add each person once and pick their role, department and main project.

  3. Enter the period

    Available hours (excluding leave), billable and non-billable hours, and actual and target bill rates.

  4. Look ahead

    Enter next period's booked hours to see unbooked time before it costs you.

Common questions

How is utilization calculated?

Billable hours divided by available hours, with leave excluded from available hours. Team utilization is total billable over total available, so bigger capacity counts for more.

What is blended efficiency?

Utilization multiplied by bill-rate efficiency. It shows whether someone is both busy and billing at the right rate.

How is this different from the online tracker?

The team utilization tracker handles up to 15 people in your browser. The template takes 50, adds bill rates, departments and projects, and is yours to keep and adapt.

Is it really free?

Yes. No email, no sign-up. Use it and adapt it for your own business; please don't resell it.

Will it work in Google Sheets?

It's built and tested for Microsoft Excel. It opens in Excel for the web and Google Sheets, but charts and sheet protection can behave differently there.

Want utilization, margin and cash in one monthly pack?

Project-based FP&A, monthly: estimate at completion by project, the WIP schedule, backlog, utilization and a rolling 13-week cash flow, built from your close and walked through with you each month. From $2,500/month.

Scope monthly FP&AOr download the free template

Tell us where cash is tight.

Send a short note on your business and what you need. We reply within 24 hours (by the next business day if you write at the weekend), usually to set up a short intro call - or by email, if you'd rather.

hello@mesfonic.com