Home / Toolkit

Weighted pipeline calculator

Up to six opportunities, each with a value, a win probability and an expected month: total pipeline, weighted pipeline, and the weighted value by month. Runs in your browser; nothing is stored or sent.

Your opportunities
Use YYYY-MM, for example 2027-01

Rows count only when the value is above zero. Leave unused rows blank. Names are labels only and are not used in the math. Our guide to forecasting revenue from backlog and pipeline shows how the weighted total feeds a revenue forecast.

Results update as you type.

Your weighted pipelineEstimate
Total pipeline-
Weighted pipeline-
Opportunities counted-

Enter your numbers to see the result.

Worked example

Example with the default numbers: five opportunities filled in and one row left blank. Total pipeline is $1.75M ($400,000 + $250,000 + $600,000 + $180,000 + $320,000). Weighted pipeline is $548k: $100k from the first opportunity ($400,000 at 25%), $125k from the second ($250,000 at 50%), $60k from the third ($600,000 at 10%), $135k from the fourth ($180,000 at 75%) and $128k from the fifth ($320,000 at 40%). That is an average weighting of 31.3%. By month, the weighted value is $225k in 2027-01, $195k in 2027-02 and $128k in 2027-03. These are example numbers, not your pipeline.

Common questions

What is weighted pipeline?

The sum of each opportunity's value multiplied by its probability of being won. A $400,000 opportunity at 25% counts as $100,000 of weighted pipeline. It is the expected value of the pipeline, not a promise that any single deal will land.

How should I set the probabilities?

Tie them to stage and evidence, not optimism: a first conversation is low, a written proposal with a named decision maker is higher, verbal agreement awaiting signature is highest. Use the same scale every month so movements in the weighted total mean something.

Why split the weighted pipeline by month?

Because timing drives staffing and cash. The same weighted total landing in one month is a capacity problem; spread over a quarter it is a plan. The month split shows when the expected work arrives, which is what hiring and scheduling decisions need.

What do I do with rows I do not need?

Leave them blank. A row only counts when it has a value above zero, so unused rows, and rows with a value but no probability, are handled safely: a missing probability counts as zero rather than breaking the totals.

Keep reading

Want the pipeline inside your forecast?

A weighted pipeline only helps when it flows into revenue, staffing and cash. Outsourced FP&A keeps that chain current every month, from $2,500/month. The method is laid out in our overview of FP&A for project-based firms.