The short version
- Overhead rate = total indirect costs / direct labor. Direct labor is the salary cost of time charged to projects.
- Indirect costs include fringe (payroll taxes, benefits, paid leave), facilities, administrative salaries, software, insurance and marketing.
- A direct labor dollar really costs the firm 1 plus the overhead rate. At a 150 percent rate, $1 of project salary is $2.50 of full cost before profit.
- Do not borrow a published rate. Definitions differ and your cost structure is your own. Calculate yours, every year.
Direct costs and indirect costs
Every cost in an architecture or engineering firm falls into one of two buckets. A direct cost exists because a specific project exists. The largest is direct labor: the salary cost of the hours staff charge to projects. Direct costs also include project-specific spending such as subconsultants, printing, travel to a site and permit fees, although those are usually handled separately from the overhead calculation, often as reimbursables or direct pass-throughs.
An indirect cost keeps the firm running but belongs to no single project. Rent is the obvious example, but the bucket is much bigger than rent. It includes fringe costs attached to all labor, the salaries of administrative and marketing staff, the non-project time of technical staff and principals, software, insurance, professional fees and business development. The classification rule is simple to state and worth applying strictly: if the cost would disappear when one project disappears, it is direct. If the firm would still pay it next month with that project gone, it is indirect.
Two classification choices deserve care because they move the rate a lot. First, fringe: payroll taxes, health and retirement benefits, and paid leave are indirect in the standard treatment, even though they attach to people who also do direct work. Paid leave is the clearest case, since leave hours are by definition not charged to projects. Second, principal time: hours a principal charges to a project are direct labor at salary cost, and hours spent running the firm are indirect. Firms that put all principal compensation in one bucket or the other get a rate that is wrong in a direction that flatters them, which is the most dangerous direction.
The formula
Overhead rate = total indirect costs / direct labor
Use a full year of actual costs for both inputs, from the same period. Direct labor here means raw salary cost of project-charged time, before fringe, because fringe sits in the numerator as part of indirect costs. Mixing definitions, for example putting loaded labor in the denominator and fringe in the numerator too, double counts and understates the rate. Pick the standard structure, write it down, and use it every year so the rate is comparable over time.
The rate also explains its companion measure. Full cost of a direct labor dollar is 1 + the overhead rate. Revenue divided by direct labor is the net multiplier, and the firm only profits when the multiplier exceeds 1 + the overhead rate. The free net multiplier calculator and the bill rate calculator work the pricing side of this relationship once you know your rate.
Worked example: calculating the rate
Take a fictional 25-person architecture and engineering firm. For its last full year, the salary cost of time charged to projects, its direct labor, was $960,000. Its indirect costs were:
- Payroll taxes and benefits: $384,000
- Paid leave and holidays: $156,000
- Rent and utilities: $186,000
- Administrative and marketing salaries: $420,000
- Software: $72,000
- Insurance: $60,000
- Professional fees: $54,000
- Office and other indirect costs: $108,000
Step 1: total the indirect costs. Fringe is $384,000 + $156,000 = $540,000. Adding the rest: $540,000 + $186,000 + $420,000 + $72,000 + $60,000 + $54,000 + $108,000 = $1,440,000.
Step 2: divide by direct labor. $1,440,000 / $960,000 = 1.50. The overhead rate is 150 percent. Every dollar of project salary carries $1.50 of indirect cost, so its full cost is $1 + $1.50 = $2.50.
Step 3: sanity check the components. Fringe alone is $540,000 / $960,000 = 56.25 percent of direct labor, and facilities are $186,000 / $960,000 = 19.4 percent. Breaking the rate into components like this shows where a change will come from if the rate moves next year: a rent increase lands in facilities, a benefits renewal lands in fringe.
Applying the rate to a project
Now price a project. The estimate calls for $40,000 of direct labor at salary cost. Step 1: apply overhead. $40,000 x 1.50 = $60,000 of indirect cost. Step 2: add for full cost. $40,000 + $60,000 = $100,000. That is the break-even fee before direct project expenses and before profit. Step 3: add target profit. For a 20 percent profit margin on the fee, divide by (1 - 0.20): $100,000 / 0.80 = $125,000. Check: profit is $125,000 - $100,000 = $25,000, and $25,000 / $125,000 = 20 percent. The implied net multiplier is $125,000 / $40,000 = 3.125, comfortably above the break-even multiplier of 2.50, which is exactly the cushion the profit target requires.
The same math works at the level of one person. A staff member earning $93,600 works 2,080 paid hours a year, so raw salary cost is $93,600 / 2,080 = $45 per hour. Full cost per direct hour is $45 x 2.50 = $112.50. Any billing rate below $112.50 for that person's project hours loses money on a full-cost basis, whatever the timesheet summary suggests. This is why the overhead rate belongs in every fee proposal review, alongside the utilization assumptions in our guide to setting utilization targets by role.
Using the rate during the year
The rate you calculate from last year's actuals is the rate you price with this year, but costs do not stand still while you use it. Most firms therefore apply a planned rate during the year, built from the current year budget for indirect costs and direct labor, and then compare it with the actual rate once the year closes. If indirect costs run hot or direct labor falls short, the actual rate comes in above the planned rate, and projects that looked profitable at the planned rate were quietly under-recovering overhead all year. That gap is worth one line in every quarterly review: planned rate, year-to-date actual rate, and the dollar effect on project margins to date.
The rate also disciplines hiring decisions. A new hire adds salary to direct labor only to the extent their hours land on projects; in the first months, much of a new hire's time is training and business development, which is indirect. Adding two junior staff can therefore raise the overhead rate in the short run even though each salary is modest, because the denominator grows slowly while fringe and supervision costs arrive immediately. None of that argues against hiring. It argues for pricing the hiring year with the rate that year will actually produce, not the rate last year produced.
Common mistakes
Using total labor as the denominator
If administrative salaries sit in indirect costs and also in the labor base, they are counted twice and the rate comes out too low. The denominator is direct labor only: salary cost of project-charged time.
Leaving out paid leave or principal admin time
Both omissions shrink the numerator and flatter the rate. The firm then prices work as if leave were free and principals managed the firm in their spare time.
Calculating the rate once and keeping it for years
The rate is sensitive to the denominator. If this firm's direct labor fell 10 percent to $864,000 while indirect costs held at $1,440,000, the rate would jump to $1,440,000 / $864,000 = 166.7 percent, and fees priced on the old 150 percent rate would quietly under-recover overhead on every project. Recalculate annually, and again after any structural change.
Treating a borrowed benchmark as a target
Published ranges mix firm sizes, markets and definitions. A firm that manages its rate down toward someone else's number may cut costs it needs, or worse, price to a rate it does not actually have. Calculate yours, watch its trend, and manage the components. If your rate and project margins need a full review, our outsourced FP&A service, from $2,500/month, maintains both monthly; margin problems that trace back to pricing are also covered in our guide to project margin leakage.
Common questions
What is a normal overhead rate for an architecture or engineering firm?
There is no normal rate you can safely borrow. Published figures mix firms of different sizes, cost structures and definitions, so a borrowed number can be off by enough to misprice every project. Calculate yours from your own indirect costs and direct labor, using the formula on this page, and update it at least once a year.
Is paid time off a direct or indirect cost?
Indirect, in the standard treatment. Leave, holidays and sick time are paid but not charged to projects, so they sit in fringe within indirect costs. The important thing is consistency: whichever treatment you choose, apply it the same way every year so your rate stays comparable.
Should principals' time be in direct labor?
Only the hours principals charge to projects, at their salary cost for those hours. Principal time spent on management, business development and administration is indirect. Splitting principal time honestly is often the single biggest correction when a firm calculates its rate for the first time.
How often should we recalculate the overhead rate?
Once a year at minimum, from the prior year's actual costs, and again whenever something structural changes: a move, a large hire wave, a lost anchor client or a shift in utilization. A rate built on three-year-old costs misprices today's work.
What is the difference between the overhead rate and the net multiplier?
The overhead rate measures cost: indirect costs divided by direct labor. The net multiplier measures pricing: net revenue divided by direct labor, and it includes profit. The multiplier must exceed 1 plus the overhead rate for the firm to make money. Our net multiplier calculator works the pricing side of the same relationship.
Try it in Excel: the free project pricing calculator template for Excel: cost each role and expense by month, price to a target margin, and see the peak cash the deal needs before it pays. No email or sign-up.
Keep reading
How to track project profitability
Job costing that applies your overhead rate project by project, while work is still running.
GuideHow to set utilization targets by role
The denominator's other half: how many hours realistically land on projects.
GuideEstimate at completion (EAC)
Forecasting final project cost, including the overhead the remaining hours will carry.
GuideProject margin leakage
Where margin escapes between the priced fee and the collected fee.
General information, not advice for your specific situation.
Scope your project in a few minutes
Answer a few questions about your firm and what you need, and get a recommended service and price. No call required to get the recommendation.
Prefer email? hello@mesfonic.com
Mesfonic is not a CPA firm. It does not provide audit, review, attest, tax, legal or investment services, and nothing on this site is professional advice for your specific situation.
Forecasts and analyses are estimates based on the information you provide. Actual results will differ.