The short version
- Project profitability is an entry discipline, not a report. Costs must be tagged to projects when they are recorded.
- Set up job costing in layers: projects, a short list of cost codes, timesheets coded daily, and burden and overhead applied by one consistent rule.
- Run the same small set of reports on the same day every month: project profit and loss, hours against estimate, and unbilled work.
- In the worked example below, a project that looks like a $55,500 win at direct cost is a $34,620 win once burden and overhead are counted.
The problem: one profit number for the whole firm
Most accounting systems can tell you whether the firm made money last month. Far fewer owners can say which projects made it. The gap is rarely the software. Systems firms already use, such as QuickBooks, Xero, Sage, Deltek or Procore alongside the accounting ledger, all support projects, jobs or cost codes in some form. The gap is that costs enter the system tagged for tax and payment purposes, not for project purposes. A supplier bill gets coded to materials. A card charge gets coded to travel. Nobody records which project caused the cost, and three months later nobody can reconstruct it.
Project profitability matters because averages lie in both directions. A firm can post a healthy month while one large project quietly loses money every week, subsidized by three good ones. By the time the loss shows up in the company number, the project is finished and the lessons, and the cash, are gone. Getting project profit out of your existing system is a setup and discipline project, in four layers.
Layer 1: job costing setup
Create a project record for every engagement before work starts, with the contract value, the estimate by phase, and a start and end date. Make the project a required field on every transaction type that can carry project cost: timesheets, supplier bills, expenses, card charges and subcontractor invoices. Required is the key word. An optional project field is a field that stays empty on busy days, which are exactly the days with the most cost to tag.
Close projects promptly when they finish. Open projects attract stray costs for months: a courier charge here, a reprint there, each too small to query and together large enough to distort the final margin and hide which active project the cost belonged to. A short monthly routine, locking completed projects to new postings, stops the drift. Our guide to tracking project profitability covers the project record and review rhythm in more depth.
Layer 2: cost codes that match how you sell
Cost codes divide each project into the phases or work types you estimate and sell: design, documentation, site work, project management, and so on. Keep the list short, typically five to fifteen codes for a small or mid-size firm, and use the same codes in estimates, timesheets and cost postings. That sameness is what makes estimate-versus-actual reporting possible later.
Every extra code has a cost. Long code lists slow down timesheet entry, multiply coding errors, and produce reports with lines too small to act on. If two codes are always discussed together in your project reviews, merge them. If one code routinely holds a third of project cost and nobody can say what is inside it, split it. Review the list once a year against the last year of estimates, and resist adding codes for a single unusual project; use a note on the project record instead.
Layer 3: timesheet discipline
Labor is the largest project cost in most firms, and the timesheet is its only source document. Three rules produce usable data. Enter time daily, because Friday reconstruction of a full week is fiction with good intentions. Code time to project and cost code at entry, including internal and non-billable time, so total hours reconcile to payroll hours. And have the project lead approve timesheets weekly, while the work is still visible enough to spot a miscoded day.
Non-project time needs codes too: business development, administration, training, leave. Without them, staff hide non-billable hours inside project codes to look busy, and project margins absorb costs they did not cause. The utilization picture also depends on this honesty, as our guide to utilization rate and cash flow explains. Publish the rule that nobody is punished for recording internal time accurately; the goal is true project cost, not maximum billable hours on paper.
Layer 4: burden and overhead allocation
Direct cost alone overstates every project margin. Two more layers belong in a full project cost. Labor burden is the cost of employing the people whose hours sit in the timesheet: payroll taxes, benefits and insurance, expressed as a percentage of wages. Overhead is everything the firm needs that no single project causes: rent, management, software, marketing and administration. Allocate overhead with one driver and use it consistently, commonly direct labor hours or direct labor cost, at a rate set from the annual budget and reviewed each year.
Show both margins. Gross margin, revenue minus direct cost and burden, tells you whether the work itself is priced and delivered well. Margin after overhead tells you whether the portfolio of projects carries the firm. A project can be a good project at gross margin and still leave the firm short if too much of the portfolio prices at that level. This is where project margin leakage usually hides: not in one dramatic overrun, but in small costs that were never assigned anywhere.
Worked example: one project, fully costed
Take a fictional project with a fixed fee of $120,000 at a small professional services firm. The accounting system, set up as above, reports:
- Direct labor: 720 hours at an average wage cost of $50 an hour = $36,000
- Subcontractors: $22,000
- Direct expenses (travel, printing, permits): $6,500
- Labor burden rate: 28 percent of wages
- Overhead rate: firm overhead of $270,000 divided by 18,000 direct labor hours a year = $15 an hour
Step 1: direct cost. $36,000 + $22,000 + $6,500 = $64,500.
Step 2: burden. 28 percent x $36,000 = $10,080. Cost after burden is $64,500 + $10,080 = $74,580.
Step 3: overhead. 720 hours x $15 = $10,800. Total project cost is $74,580 + $10,800 = $85,380.
Step 4: margins. Gross profit before overhead is $120,000 - $74,580 = $45,420, a gross margin of $45,420 / $120,000 = 37.85 percent. Profit after overhead is $120,000 - $85,380 = $34,620, a margin of $34,620 / $120,000 = 28.85 percent. Both numbers are true; they answer different questions.
Step 5: why the timesheet rules matter. Suppose 40 hours of work on this project were never coded to it. The missing cost is 40 x $50 = $2,000 of wages, plus burden of 28 percent x $2,000 = $560, plus overhead of 40 x $15 = $600, a total of $3,160. Reported profit would be overstated by that amount, and some other project or the overhead pool absorbs the cost instead. Small weekly gaps, repeated across projects, are how firms end up busy, apparently profitable by project, and short of cash. The project profitability calculator runs this same layering for a project of your own.
The monthly reporting routine
Run the same reports on the same day each month, after timesheets and supplier bills for the month are complete. Four reports cover most decisions. A project profit and loss for every active project, showing revenue, direct cost, burden, overhead and both margins. An hours report comparing hours by cost code against the estimate, which spots overruns months before the cost report does. An unbilled work report, showing work done but not yet invoiced, because profit that sits unbilled is a cash problem forming. And a completed project summary, comparing final margin to the margin expected at sale, which feeds estimating.
Review the reports in a short meeting with a fixed agenda: which projects moved most, which estimates are now at risk, and what changes this month, on price, staffing or scope control. Keep the output small: a list of actions with owners. Firms that want this routine built and run for them use our outsourced FP&A service, and firms building their own pack can borrow the structure in our guide to financial dashboards for project-based firms. Either way, the value is in the repetition: the same numbers, the same day, every month, until project margin becomes a fact the firm manages rather than a surprise it discovers.
Common questions
Why does our accounting system show company profit but not project profit?
Because company profit only needs costs recorded once, in total. Project profit needs every cost tagged to a project as it is entered: timesheets coded to jobs, supplier bills split by job, and card charges assigned before they are approved. If the tagging step is missing at entry, no report can rebuild it later. Fix the entry workflow first; the reports follow.
Should overhead be allocated to projects?
Yes, if you want a true project margin rather than a gross margin. Allocate overhead with one simple, consistent driver, such as direct labor hours or direct labor cost, and show project results both before and after overhead. The two views answer different questions: before overhead shows whether the work itself pays; after overhead shows whether the firm pays.
How often should we review project profitability?
Monthly, on a fixed date, with the same reports in the same order. Weekly hour checks catch timesheet gaps while they are fixable, but margin decisions belong in the monthly review, when costs are complete. Reviewing daily against incomplete cost data produces noise and arguments instead of decisions.
What if our timesheets are unreliable?
Start there, before any report work. Require daily entry, weekly approval by the project lead, and a lock after approval. Then audit one project a month by comparing timesheet hours to schedules, site records or deliverables. Reliability improves fast once people see the numbers used in real decisions, and see gaps followed up every week.
Can a small firm do job costing without new software?
Usually yes. Mainstream accounting systems already support jobs or projects, cost codes and timesheet tagging. The gap in most small firms is setup and discipline, not software: codes that mirror how work is sold, mandatory project fields on every transaction, and one monthly reporting routine. Add specialist tools only when volume, not features, becomes the constraint.
Try it in Excel: the free project profitability tracker for Excel: estimate at completion, margin against target, over and under billing and margin leakage for up to 30 projects. No email or sign-up.
Keep reading
How to track project profitability
The project record, cost capture and review rhythm behind reliable project margins.
GuideProject margin leakage: where profit slips away
ToolProject profitability calculator
GuideFinancial dashboards for project-based firms
General information, not advice for your specific situation.
Not sure which service fits your project?
Answer a few questions about your firm and what you need, and we will recommend the service and price that fit: a 13-week cash flow forecast at $2,900 fixed, a Liquidity review at $950 fixed, project-based FP&A, monthly, from $2,500/month, or board and lender reporting from $1,500/month.
Or write to us at hello@mesfonic.com
Mesfonic is not a CPA firm. It does not provide audit, review, attest, tax, legal or investment services, and nothing on this site is professional advice for your specific situation.
Forecasts and analyses are estimates based on the information you provide. Actual results will differ.