The short version
- Under a fixed fee, your firm carries the overrun risk and keeps the gain when the work takes fewer hours than estimated.
- Under time and materials, the client carries the overrun risk and your margin per hour stays constant, but so does your ceiling.
- Fixed fee usually bills faster at milestones or on signing. Time and materials bills in arrears, so you fund the work longer.
- A mix often works best: fixed fee for well-defined phases, time and materials or a capped rate for the parts nobody can scope yet.
The real question: who carries the risk?
Every project estimate is wrong in one direction or the other. The work takes more hours than planned, or fewer. The billing model decides who absorbs that error. Under a fixed fee, the price is set before the work starts, so every extra hour comes out of your margin and every saved hour adds to it. Under time and materials, the client pays for the hours actually worked, so the client's budget absorbs the error and your margin per hour never changes.
Neither allocation is fairer in the abstract. A fixed fee is a risk transfer, and risk transfers have a price: a rational firm charges more for a fixed fee than the expected cost of the same work on an hourly basis, because sometimes the estimate will be badly wrong. A client who demands fixed fees on everything and negotiates them down to the hourly estimate is asking for the insurance without the premium. Recognizing that trade is the starting point for pricing either model well.
Worked example: one project, both models
Take a fictional project estimated at 1,000 hours. The firm's billing rate for the work is $150 per hour, and its fully loaded labor cost is $85 per hour. The estimate, the rate and the cost are identical under both models. Only the contract differs.
Scenario 1: the work takes exactly 1,000 hours. Time and materials revenue is 1,000 x $150 = $150,000. Cost is 1,000 x $85 = $85,000. Margin is $150,000 - $85,000 = $65,000, or 43.3 percent. A fixed fee priced from the same estimate is also $150,000, with the same $85,000 cost and the same $65,000 margin. On estimate, the models are identical. The difference only appears when the estimate is wrong.
Scenario 2: the work overruns to 1,200 hours. Cost rises to 1,200 x $85 = $102,000. Under time and materials, revenue rises with it: 1,200 x $150 = $180,000, and margin is $180,000 - $102,000 = $78,000. The client paid for the extra 200 hours. Under the fixed fee, revenue stays at $150,000, so margin falls to $150,000 - $102,000 = $48,000, or 32 percent. Your firm absorbed 200 x $85 = $17,000 of extra cost. The project is still profitable, but a fifth of its expected margin went to the overrun.
Scenario 3: the work finishes in 850 hours. Cost is 850 x $85 = $72,250. Under time and materials, revenue is 850 x $150 = $127,500 and margin is $127,500 - $72,250 = $55,250. Under the fixed fee, revenue stays at $150,000 and margin rises to $150,000 - $72,250 = $77,750, or 51.8 percent. Your firm kept the whole efficiency gain.
Read the three scenarios together and the pattern is plain. Time and materials holds margin near 43 percent in every case and lets revenue move. Fixed fee holds revenue constant and lets margin swing between 32 and 52 percent. Which pattern suits your firm depends on how good your estimates are and how much margin volatility your cash position can absorb. A firm that estimates well earns more under fixed fees over a portfolio of projects. A firm that estimates poorly donates the difference to its clients.
Cash timing: the second difference
Margin is only half the story. The models also bill on different clocks. A fixed fee is commonly billed on signing and at milestones: on this project, 30 percent on signing ($45,000), 40 percent at the midpoint ($60,000) and 30 percent on completion ($45,000) would be a typical schedule. The first invoice can go out before any work starts, so the client funds part of the delivery.
Time and materials bills in arrears, usually monthly. Your team works through January, you invoice in early February, and the client pays on terms in March. You have funded roughly two months of payroll before the first payment arrives. On a single project that is a nuisance. Across a whole portfolio of hourly work it is a permanent working capital load, and it is why two firms with identical margins can have very different bank balances. Our guide to unbilled revenue and WIP shows how to measure the work you have done but not yet billed, and the project cash curve calculator plots the cash position of a single project month by month under either billing pattern.
Change orders under each model
Scope changes test both models. Under a fixed fee, a change order is the only mechanism that protects the price: extra work gets its own estimate, its own price and the client's signature before the work starts. On the example project, a 100-hour addition priced at the standard rate is a $15,000 change order. Skip the signature and those 100 hours land in scenario 2, paid for by you. Our guide to change orders and cash quantifies what unsigned change work costs a firm over a year.
Under time and materials, change orders feel easier because the meter is already running. The risk is quieter: the client authorized a budget, not an unlimited meter. When hours approach the amount the client expected, confirm in writing that the additional work sits inside the existing authorization, or agree a higher cap in writing. The firms that get hurt on hourly work are rarely hurt by the rate. They are hurt by a client who says, truthfully, that nobody told them the total had doubled.
When a mix works best
Most mature firms run a deliberate mix rather than a single model. Fixed fee fits work the firm has done many times, with a scope it can define tightly and a cost history it trusts: standard phases, repeatable deliverables, known review cycles. Time and materials fits discovery work, open-ended support, and any phase whose scope depends on what an earlier phase finds. A common structure is a fixed fee for the defined phases with a capped hourly arrangement, often called not-to-exceed, for the undefined parts. On the example project, a cap of $165,000 would let the client authorize hourly billing with a ceiling equal to 1,100 hours at $150, protecting the client past the estimate while keeping your monthly billing and cash flow intact.
Whatever mix you choose, track profitability by project under both models. Our guide to tracking project profitability sets out the job cost routine, and project margin leakage covers the small, repeatable ways margin escapes after the contract is signed. If your pricing decisions need a second pair of eyes, a liquidity review at $950 fixed examines how your billing models and payment terms combine into your actual cash position, and our board and lender reporting, from $1,500/month, keeps project margin in front of decision-makers every month.
How to choose, project by project
Run each new engagement through four questions. First, how well can you define the scope today? Work you can describe deliverable by deliverable is fixed fee work. Work described as "help us figure out" is hourly work until the figuring out is done. Second, how deep is your cost history on similar work? A firm pricing its tenth project of a type can fix a fee with confidence; a firm pricing its first is guessing, and guesses belong on the client's side of the contract or behind a cap. Third, what does your cash position allow? A firm with a thin cash balance should weight billing speed heavily, because a fixed fee with a signing payment funds delivery while an hourly engagement with slow terms consumes the line. Fourth, how does this client behave? A client with a history of scope growth and slow approvals is a poor candidate for an uncapped hourly arrangement and a dangerous one for a loosely worded fixed fee. Write the answers into the proposal file. When a project later goes wrong, that note tells you whether the model was wrong or the estimate was, and the two failures need different fixes.
Common questions
Which model is more profitable?
Neither, on average. Fixed fee pays more when your estimates are accurate or conservative, because you keep the efficiency gains. Time and materials pays a steadier margin per hour but caps your upside at your rate. Profitability follows estimating skill and scope control, not the label on the contract.
Why do clients prefer fixed fee?
Budget certainty. A fixed fee lets a client approve a known amount through their own internal process once, instead of monitoring hours every month. That preference is real and worth something: many clients will accept a higher total price in exchange for certainty, which is the risk premium that makes fixed fee work for the firm.
What is a not-to-exceed arrangement?
Time and materials billing with a cap. The client pays for actual hours at agreed rates, but never more than the cap without written approval. The firm keeps hourly billing and monthly cash flow, and the client gets a ceiling. Set the cap from a realistic high-end estimate, not the optimistic one.
How should change orders work under each model?
Under fixed fee, every scope change needs a priced, signed change order before the extra work starts. Under time and materials, confirm in writing that the new work falls inside the existing authorization and budget, or raise the cap in writing. In both models, the rule is the same: no written agreement, no extra work.
Can we switch a project from one model to the other midstream?
Yes, with a written amendment that both sides sign. State the value of work completed to date, how it will be settled, and the model that governs the rest. Switching without that paper is how firms end up arguing about which rules applied to which month.
Try it in Excel: the free project pricing calculator template for Excel: cost each role and expense by month, price to a target margin, and see the peak cash the deal needs before it pays. No email or sign-up.
Keep reading
How to track project profitability
The job cost routine that shows margin by project while there is still time to act.
GuideProject margin leakage
Where margin escapes between signing the contract and collecting the final invoice.
GuidePercent complete revenue explained
How revenue recognition follows progress on long projects, under either billing model.
GuideChange orders and cash
What unapproved change work does to WIP, billings and the bank balance.
General information, not advice for your specific situation.
Scope your project in a few minutes
Answer a few questions about your firm and what you need, and get a recommended service and price. No call required to get the recommendation.
Prefer email? hello@mesfonic.com
Mesfonic is not a CPA firm. It does not provide audit, review, attest, tax, legal or investment services, and nothing on this site is professional advice for your specific situation.
Forecasts and analyses are estimates based on the information you provide. Actual results will differ.